APM Terminals - Workforce Planning ‘From Scratch’
No old habits, but a brand-new staff planning system designed from scratch. This was the challenge that ORTEC accepted when APM Terminals asked for assistance in optimizing their workforce planning. This request came in response to the construction of anew terminal at the Rotterdam port where variable shippin schedules play an important role.
Download Item